What Does non slip floor treatment Mean?
Allow the next coat of epoxy dry for 24 hours. Steer clear of heading near the floor though the 2nd coat dries, making sure the area is open up and adequately ventilated. Give the floor at the least daily to treatment right before strolling on it or employing it.[23] X Exploration sourcePolished Concrete: Sharpening concrete can attain a smooth ind